TACROM SERVICES SUCCESSFULLY COMPLETES A MULTISTAGE FRAC PROJECT

Tacrom_MULTISTAGE FRAC PROJECT

A “Plug and Perf” technique was used to allow multiple stages to be treated in one 24 hour period.
Each stage included a Minifrac and Frac with a borate cross-linked fluid and Intermediate Strength Proppant.
All pumping data was transmitted to the customer in real time.