Services
April 20, 2015
A “Plug and Perf” technique was used to allow multiple stages to be treated in one 24 hour period.
Each stage included a Minifrac and Frac with a borate cross-linked fluid and Intermediate Strength Proppant.
All pumping data was transmitted to the customer in real time.